Vishnugad Pipalkoti Hydro Electric Project — VPHEP
UPSC Relevance: Geography
Why in News?
The Vishnugad Pipalkoti Hydro Electric Project (VPHEP) remains an important infrastructure project in Uttarakhand.
Key Facts
Location → Chamoli district, Uttarakhand
River → Alaknanda
Type → Run-of-the-river hydroelectric project
Capacity → 444 MW
Configuration → 4 × 111 MW
Implementing company → THDC India Limited
Dam → approximately 65 m high
Head Race Tunnel → about 13.4 km
Underground powerhouse
Design energy → approximately 1,657 MU annually according to current project data.
River Significance
The Alaknanda is a major tributary of the Ganga.
Important sequence:
Alaknanda + Bhagirathi → Devprayag → Ganga
Strategic Importance
The project contributes to:
Renewable electricity generation
Himalayan hydropower potential
Grid stability
Regional development
Environmental Concerns
Himalayan hydropower projects raise issues relating to:
Landslides
Seismicity
Glacial hazards
River ecology
Sediment transport
Cumulative impacts of multiple hydropower projects
Tunnelling in fragile geology
UPSC Key Pointers
VPHEP → 444 MW → Alaknanda → Chamoli → Uttarakhand → Run-of-the-river
Share this article